STOPMAX blocker installation has no major difference from the installation of STOPBASE and STOPECO blockers.

One key difference is much greater number of anchoring elements: at least 12 per running meter. This is essential for the structure strength balance and for securing it to the base.

This requirement implies there is a solid base in the blocker location.

As always, we deliver your blocker ready for operation once it is connected to electric power supply; for hydraulically driven blockers oil filling is an extra requirement.

We have confidence in the quality of our blockers and reliability of our engineering design; therefore we keep our product warranty valid, regardless of the party who performed the installation.

Installation guide:

 STOPMAX surface-mounted blocker installation guide (4,5 MB)

 STOPMAX underground blocker installation guide(3,5 MB)